• News from
    Building & Construction

    Building Projects: HTK 2G 75 Product Review

    You are here: Home - News HTK 75 Review Reading

    EJOT ® The quality connection
  • News from
    Building & Construction

    Building Projects: HTK 2G 75 Product Review

    You are here: Home - News HTK 75 Review Reading

    EJOT ® The quality connection
  • News from
    Building & Construction

    Building Projects: HTK 2G 75 Product Review

    You are here: Home - News HTK 75 Review Reading

    EJOT ® The quality connection

HTK 2G 75mm tubewasher passes strength test on Berkshire Care Home

Story added July, 2017

As work progresses on the comprehensive redevelopment of a Berkshire care home, EJOT’s new 75mm diameter tube washer for part-adhered systems has received positive feedback from roofing contractor GWB Roofing, based in Chippenham.

Appointed by the Royal Wootton Bassett building firm R. J. Leighfield and Sons, GWB were tasked with the installation of a part mechanically fixed flat roof system, with single ply membrane adhered to the surface. When complete, the Foster’s Lane Care Home in Woodley near Reading, will provide 34 self-contained apartments alongside multiple communal living facilities. The roofing areas requiring waterproof membrane protection are significant and the GWB team opted for an Alwitra Evalon-v membrane with Kingspan insulation secured to a plywood deck.

Historically, a mix of tried and tested fixings would have been normal procedure, but GWB’s Managing Director Barry Barker, had been introduced to EJOT’s HTK 2G 75mm tube washer at a contractor’s conference. EJOT’s Kevin Rackley explained: “Having the product to hand allowed me to explain key benefits; load resistance, minimal cold-bridging, known-performance data to name a few. But the real proof is when a customer takes the product to application”.

Barry Barker takes up the review: “It’s a well worn phrase now, but EJOT’s 75mm tube washer did exactly what it says on the tin! We generally prefer to locate the sleeve within the insulation before fastening to the deck and the tube washer proved to be very strong, very robust. In fact, we used hammers to drive the tubes to insulation depth such is the product’s strength. That meant a very fast and secure installation in addition to the HTK’s lifetime performance benefits”.

Like its 50mm counterpart used for complete mechanical installations, HTK 2G 75 is manufactured by EJOT using the latest polyethylene which provides increased strength and enables the tube to be made in a broader range of lengths.

GWB Roofing has recently become a member of the Single Ply Roofing Trade Association SPRA and EJOT’s technical team were able to advise Barry’s team on all aspects of installation, based on SPRA’s own guidelines for this type of system. Barry Barker said: “There were no hitches, and no problems switching to a new product – we were well briefed in advance and Kevin made several site visits to ensure installation went smoothly. We will use the HTK 2G 75 again, without hesitation”.

Foster’s Lane Care Home is under construction at Woodley near reading. The project is due to complete in October 2017 and is managed by Wokingham Housing Ltd on behalf of Wokingham Borough Council.

FR-Brochure.png

Intelligent Fastening for Membrane Sytems

EJOT UK's flat roofing and Membrane Systems brochure has been updated to showcase the widest range of fixing products and Systems. Click below to request a copy.

Back to News Page

Top of pagePrint page

EJOT® - The Quality Connection - This statement captures the Group's ethos. On one hand, it reflects the uncompromising efforts made to achieve the highest possible levels of product quality. On the other hand, it underlines that, technical standards aside, the human aspect both inside and outside the company are just as important. Just one reason they call EJOT® the quality connection.